Rte. 3 between Burlington and NH LineCURRENT CONDITIONS | |
![]() |
Rte. 3 North (I-495 to NH Line) |
![]() |
Rte. 3 North (Rte. 128/I-95 to I-495) Road construction during the day time from Exit 25: Rte. 128/I-95 to Exit 30: I-495 - Lowell Connector. Left lane closed. in various locations. Stay right. |
![]() |
Rte. 3 South (I-495 to Rte. 128/I-95) |
![]() |
Rte. 3 South (NH Line to I-495) |
Current Travel Times: Northbound: 20 minutes Southbound: 20 minutes |